Renovations Have a Point of No Return

Writer: Dirsal Homes
Dirsal Homes
1 day ago
3 min read

Changing your mind during a renovation isn't unusual.

You see the space differently once the walls come down. Something that looked great on paper doesn't feel the same in person. You find a different fixture you like better. Maybe you suddenly realize that wall should move another six inches.

Changes happen.


But there's something homeowners don't always realize: the same change can cost very different amounts depending on when you make it.


Early Changes Are Easy


During the planning stage, changing your mind is usually pretty simple.

Move a wall on a drawing. Change the shower layout. Add an outlet. Move the vanity. Adjust the kitchen island.

At this point, we're mostly changing plans.

Once construction begins, those lines on a drawing start becoming actual framing, plumbing, electrical, HVAC and eventually finished surfaces. That's when things change.


Every Stage Makes Changes More Complicated


Let's say you decide an outlet should be moved.

Before electrical rough-in? No problem.

After electrical rough-in? Still manageable.

After drywall? Now we're opening a finished wall, moving wiring, repairing drywall and repainting.

After cabinets and backsplash are installed? That's an entirely different conversation.

It's the same outlet and the same change. But the amount of work required to make that change has completely changed.

This happens throughout a renovation. Moving a shower fixture after the plumbing is complete. Changing a doorway after framing. Adding lighting after the ceiling is closed. Changing flooring after cabinets have been installed.

At some point, you're no longer changing the work ahead. You're undoing work that's already been completed.


This Is Why We Keep Our Clients Involved


This is also why we take the time to go through each stage of a renovation with our clients.

Throughout the project, we're providing updates, doing walkthroughs, having conversations about what's coming next, and explaining why certain things are being done the way they are. We want our clients to understand what's happening in their home, not just show up at the end and see the finished product.

It also gives everyone an opportunity to look at things while they're still easy to change.

Before the walls close, let's walk through the electrical and plumbing. Before finishes go in, let's make sure everyone understands the layout. If something doesn't feel right or there's a question, we'd much rather talk about it now than after the next three stages are complete.

Keeping the homeowner involved throughout the process helps eliminate surprises and gives everyone a chance to make better decisions at the right time.


Sometimes It's Still Worth Changing


This doesn't mean you should live with something you hate just because construction has started.

If you're going to look at something every day for the next 15 years and wish you had changed it, sometimes spending the extra money now is absolutely worth it.

But that's a different decision than making the change earlier.

Our job is to explain what that change affects, what has to be redone, what it will cost, and whether it affects the schedule. Then the homeowner can make an informed decision.


This Is Why Decisions Have Deadlines


When we ask for selections or decisions by a certain date, it's not because we're trying to rush anyone.

Construction happens in a sequence.

The plumber needs information before rough-in. The electrician needs to know where things are going before the walls close. Cabinets need to be finalized before they're manufactured. Tile layouts need to be decided before installation starts.

Every decision eventually reaches a point where changing it affects something that has already happened.


Plan Early, Change Early


Nobody expects every renovation to go from start to finish without a single change.

But the earlier questions are answered and decisions are made, the easier it is to adjust the plan without wasting time or money.

Take the extra time at the beginning. Ask questions. Look at the drawings. Stay involved throughout the process.


Because in renovations, "I've changed my mind" is always easier to hear before we've already built it.

 
 
 